General Total Area
75 mts2
Area of Walls and Construction
58 mt2
Area of Cistern, septic well, fourth bomb and registration box
12 mt2
Living room, Dining room, kitchen, 2 Bedrooms and 1 Bathroom.
- Excavation and compacted building area: Vibration compacted.
- General Structure: Metal (Iron) and concrete.
- Drainage System: Run through pipes in the walls.
- Plumbing for potable water: Run through separate pipes in the walls.
- Potable Water Tank: Held inside of a reinforced concrete structure.
- Base Floor: concrete
- Tile: National or imported ceramic tile measuring 30x30cm or 40x40cm.
- Walls: Made of structural concrete blocks (20x40x9cm)
- Wall Covering: Porlant style cement and fine sand.
- Bathroom walls: National or imported ceramic tile (20x30cm) up to a height of 1.20 meters.
- Kitchen countertops: Made of artificial concrete covered with national or other ceramic tiles.
- Wall base for paint: Covered with Aditec, Sica or similar substances.
- Wall paint: Rubber paint is used.
- Ceiling: Made of smooth plaster on one floor.
- Structure and Roofing: Imported metallic Roof Tec roof treated so as not to rust. Painted with an epoxy paint (mold proof)
- Electrical Installations: seven 110volt outlets including 2 that are outside, thirteen 110v power outlets for fridge and water tank etc., 1 telephone connection point, a 4x8 electric panel + a 220 and 110 electric meter. 7 wire cable, 1 exterior circuit breaker, 1main interior circuit breaker, 3 point interior circuit breaker.
- Sanitary Installations: PVC piping for potable water and drainage. Edesa toilets or similar, pre-made ceramic sinks or similar.
- Doors: Durini Chilean doors, includes imported knobs and 3 ½ cm frames.
- Aluminum windows and glass: Clear glass with anti-mosquito mesh.
- Water pump: Pedrollo or similar pump. 110v pumps with 1/3 horsepower.
NOTE: All the requirements and additional works by contractors even for the improvement of the lot with a special foundation, enclosure, etc, or other things that are deemed necessary must be cancelled by the buyer separately.
Materials and specifications are subject to availability in the market at the time of construction of the home and other similar structures.